80m² house house construction cost 2026 — Detailed estimate
For a 80m² lot, 2026 build cost ranges from 400M VND (simple grade-4 with metal roof) to over 1680M VND (two-floor with premium finish). This article maps costs line by line so you can budget a 80m² build accurately and find places to optimize.
Use our house cost estimator to price your build using real material prices for your province — continuously updated from the Department of Construction.
1. 80m² house cost overview — 2026
80m² house house cost depends on house type, floor count, finishing tier and region. Reference cost for common house types at the same area/floor count:
| House type | Unit price (VND/m²) | Estimated total |
|---|---|---|
| Grade-4, metal roof | 4,600,000 – 5,300,000 | 400M VND – 560M VND |
| Grade-4, Thai tile roof | 5,500,000 – 6,500,000 | 520M VND – 680M VND |
| 1 ground + 1 floor | 5,800,000 – 6,800,000 | 880M VND – 1.1B VND |
| 1 ground + 2 floors | 6,000,000 – 7,200,000 | 1.4B VND – 1.7B VND |
Note: turnkey unit price includes labor + structural materials + basic finishing. Excludes design, permits, loose furniture, and contingencies.
2. Detailed line-item cost
For an accurate budget on a 80m² house build, split the total into specific line items. Common allocation for the basic finishing tier:
| Line item | Share | Estimated cost | Note |
|---|---|---|---|
| Structural & labor | 55% | 495M VND – 605M VND | Foundation, columns, beams, slabs, walls, plaster, screed. Depends on floor count and rigidity. |
| Finishing materials | 25% | 200M VND – 300M VND | Wall/floor tile, paint, doors, sanitary fixtures, lighting. |
| Electrical, plumbing & accessories | 10% | 80M VND – 120M VND | Water supply and drainage, concealed wiring, outlets, switches. |
| Design & permit | 5% | 30M VND – 70M VND | Architectural drawings, structural design, building permit fees. |
| Contingency | 5% | 40M VND – 80M VND | Material price inflation, design changes, unforeseen items. |
3. Factors that affect 80m² house cost
At the same area/floor count, real cost can swing 30–50% depending on the factors below. Understanding each helps you estimate accurately and avoid budget overruns.
Floor count and total floor area
On the same 80m² lot, a single-floor house costs ~50% of a two-floor and ~35% of a three-floor. Total floor area (m² × floors) is the real cost driver.
Structure and foundation
Weak soil (coastal areas, Mekong Delta) requires pile foundations — adding 10–20% to foundation cost vs isolated footing on firm soil.
Finishing tier
Basic finishing (mid-grade tile, standard Nippon paint, Việt Pháp aluminum doors) saves 20–30% vs premium (granite, Jotun paint, Xingfa-55 aluminum, tempered glass).
Region
Build cost in HCMC and Hanoi runs 10–15% higher than in other provinces due to labor, transport, and raw material pricing.
Material price swings
Steel, cement, and sand move 5–15% quarter over quarter. Timing purchases right saves tens of millions on a 80m² build.
4. Cost-optimization tips
- Track material prices quarterly: See the VLXD prices across 34 provinces page to time your purchases at the best price.
- Compare multiple contractor bids: Get at least 3 bids. The spread can hit 15–20% for the same design.
- Tier finishing smartly: Invest more in shared rooms (living/kitchen), save on bedrooms/auxiliary.
- Use the estimator: House cost estimator auto-fetches VLXD prices for your province — more accurate than manual.
- Compute material quantity first: Material calculator avoids over/under-buying.
5. FAQ
How much does a 80m² house cost?
A 80m² house ranges from 400M (simple grade-4, metal roof) to over 1680M VND (two-floor, premium finish). The most common tier — 1 ground + 1 floor — is 880–1120M VND.
How much steel and cement for a 80m² house?
Quick estimate: ~160 tons of steel and ~28 tons of cement for a 1 ground + 1 floor 80m² house. Use /en/material-calculator for more accurate numbers per design.
Which 80m² house type is cheapest?
Grade-4 with metal roof is the cheapest 80m² option at 400–560M VND. For larger families, 1 ground + 1 floor on 80m² balances function and cost best.
When is the cheapest time to build a 80m² house?
Early Q2 (Mar–Apr) and rainy season (Jul–Sep) have the steadiest material and labor prices. Avoid Nov–Dec — labor rises 10–15% as year-end projects rush to finish.
6. Related
- House cost estimator — Real-time VLXD-priced cost
- 2026 house price list — Turnkey & shell unit prices
- 100m² house cost — The most common size
- Grade-4 house cost — Budget single-floor builds
- VLXD prices across 34 provinces
- Construction area formulas