Vietnam House Construction Price List 2026

The 2026 house construction price list is the reference owners need to plan finances accurately before breaking ground. Prices in 2026 are up 5–10% year over year, driven by material and labor cost shifts. This article aggregates unit prices by house type, investment tier, and region across Vietnam.

Estimate build cost from real material prices

Use our house cost estimator with VLXD data updated across 34 provinces.

1. Turnkey Price List 2026

Turnkey (move-in ready) covers everything from shell to finishing: foundation, structure, roof, plaster/paint, tiles, electrical, plumbing, and doors. Owner only adds furniture.

1.1. Grade-4 Turnkey

TierUnit price (VND/m²)What's included
Budget4,600,000 – 5,100,000Metal roof, basic ceramic tile, interior paint, standard aluminum doors
Standard5,200,000 – 5,800,000Tile or RC roof, full tile finishing, exterior paint, aluminum-glass doors
Premium6,300,000 – 7,300,000Thai tile roof, granite tiles, premium paint, Xingfa/Eurowindow aluminum

Full breakdown at Grade-4 house cost.

1.2. Townhouse Turnkey

TypeStandard (VND/m²)Mid (VND/m²)Premium (VND/m²)
Single frontage5,250,0005,450,000 – 5,750,0006,550,000 – 7,000,000
Corner (two frontages)5,350,0005,550,000 – 5,950,0006,050,000 – 7,200,000
Terraced5,100,0005,350,000 – 5,600,0006,200,000 – 6,800,000

Corner townhouses cost more since two exterior sides need finishing (plaster, paint, cladding) plus extra door and drainage systems.

1.3. Villa Turnkey

Villa typeStandard (VND/m²)Mid (VND/m²)Premium (VND/m²)
Mini villa (1–2 floors)5,350,000 – 5,600,0005,800,000 – 6,200,0006,450,000 – 7,000,000
Garden villa5,600,000 – 5,950,0006,200,000 – 6,700,0007,000,000 – 8,000,000
Classical villa6,000,000 – 6,500,0006,700,000 – 7,500,0008,000,000 – 9,500,000

Classical (French/European) villas cost the most: complex decorative details, Roman columns, mansard roofs, ornate iron balconies.

2. Shell Construction Price List 2026

Shell includes structural only: foundation, columns, beams, slabs, walls, roof. Owner handles finishing (or hires another crew). Suitable for experienced owners or those who want tight cost control.

Project typeShell unit price (VND/m²)Note
Grade-43,200,000 – 3,800,000Excludes tile roof (metal roof is ~200k/m² cheaper)
Townhouse 2–3 floors3,500,000 – 4,100,000Includes RC slabs, staircase
Villa3,800,000 – 4,500,000More structural complexity, architectural details

Finishing (remaining scope)

If you build shell only, budget for finishing:

Finishing scopeUnit price (VND/m² floor)
Plaster + paint250,000 – 400,000
Tiles300,000 – 800,000
Electrical150,000 – 300,000
Plumbing120,000 – 250,000
Doors (aluminum glass / wood)250,000 – 600,000
Ceiling (gypsum / PVC)80,000 – 200,000
Total finishing1,600,000 – 4,050,000

Total (shell + finishing) lands at 4,950,000 – 7,000,000 VND/m² — similar to turnkey. The upside of DIY finishing: flexibility to pick every material.

3. Price by Project Size

Key rule: the larger the floor area, the lower the unit price. Fixed costs (foundation, roof, scaffolding, equipment) amortize over more area.

Total floor areaStandard turnkey (VND/m²)Premium turnkey (VND/m²)
Under 150m²5,500,000 – 6,500,0007,000,000 – 9,000,000
150 – 300m²5,200,000 – 6,200,0006,500,000 – 8,500,000
300 – 500m²5,000,000 – 5,800,0006,300,000 – 8,000,000
Over 500m²4,800,000 – 5,500,0006,000,000 – 7,500,000

4. Regional Price Comparison 2026

House prices vary significantly by region, primarily due to labor, material transport, and cost-of-living differences. Standard tier townhouse 2-floor comparison:

RegionUnit price (VND/m²)Vs. average
Ho Chi Minh City6,200,000 – 7,500,000+10–15%
Hanoi6,000,000 – 7,200,000+8–12%
Da Nang5,500,000 – 6,800,000+3–5%
Hai Phong, Can Tho5,300,000 – 6,500,000Average
Central provinces5,000,000 – 6,200,000−3–5%
Rural areas4,800,000 – 5,800,000−8–15%

Check specific material prices for your province at Construction material prices by province.

5. How Material Prices Affect House Prices

Materials account for 60–65% of total house cost. When material prices rise, house unit prices follow. Material movements in early 2026:

Monitor material prices on Vật Giá Top to time your material purchases.

6. 2026 Price Trends & Forecast

Overall, 2026 house prices continue moderate growth:

  • Q1 2026: highest material price spike — early-year demand + sand/stone shortage.
  • Q2–Q3 2026: prices expected to stabilize or rise slightly. Rainy season softens demand, dropping labor 5–10%.
  • Q4 2026: labor usually rises as projects rush to finish year-end.

Tip: If building in 2026, start in early Q2 (Apr–May) when material prices stabilize and weather cooperates.

7. Investment Tiers Explained

When reading the price list, understand the differences between tiers:

Budget / Basic

  • Metal roof or simple RC slab
  • Standard floor tile (100,000 – 150,000 VND/m²)
  • Interior paint: 1 primer + 2 top coats
  • Standard aluminum doors, 5mm glass
  • Domestic-brand sanitary fixtures
  • Basic electrical and plumbing

Standard / Mid

  • Tile roof or RC slab with decorative tile
  • Domestic granite floor tile (200,000 – 350,000 VND/m²)
  • Waterproof exterior paint, premium interior
  • Xingfa/Eurowindow aluminum-glass systems
  • Branded fixtures (TOTO, Inax, American Standard)
  • Concealed electrical, full hot/cold water

Premium

  • Thai/Japanese tile roof, galvanized steel trusses
  • Imported tiles (400,000+ VND/m²)
  • Full gypsum ceiling, recessed LED lighting
  • Xingfa aluminum with Low-E insulated glass
  • Premium imported sanitary fixtures
  • Smart electrical, solar water heater

8. How to Use This Price List Effectively

Step 1: Calculate converted construction area

Don't multiply unit price by lot area — use converted construction area with coefficients for foundation, roof, balcony, yard. See construction area formulas.

Step 2: Pick a tier matching your budget

Don't force premium if budget is tight. Better to build standard tier solidly and upgrade later. Many owners build shell first, finish when funds allow.

Step 3: Use the estimator

Our house cost estimator lets you enter area, pick a template, choose a province, and get a detailed estimate with real local material prices.

Step 4: Compare to contractor bids

With reference numbers from this list and the estimator, get bids from at least 3 contractors. Compare line item by line item — not just the total.

9. FAQ

What does turnkey unit price include?

Includes: foundation, RC structure, walls, roof, plaster/paint, tiles, electrical/plumbing, doors, basic sanitary fixtures. Excludes: land, permits, architectural design, furniture, landscaping.

Why do contractor quotes differ from reference prices?

Due to: material spec (same "tile" at different prices), foundation type (weak soil needs much pricier piling), site location (narrow alleys add transport cost), contractor margin (15–25%).

Will 2026 house prices keep rising?

Expect +5–8% in 2026, mainly from continued sand/stone shortage and labor wages. Slower than 2022–2024 (+15–20%/year).

Turnkey or buy materials yourself?

If you have time and know materials, DIY saves 10–15%. Track prices at Vật Giá Top to buy at the right time. If busy, turnkey is more convenient — just ensure the contract specifies every material grade.

Estimate your house cost now

Enter area, template, and province — our estimator computes cost using real material prices.

10. Related Articles

Vietnam House Construction Price List 2026 — Turnkey & Shell Prices | Vật Giá Top